Real projects

Foundation waterproofing

Foundation waterproofing
Location
Apahida
Area
260 m²
Duration
6 days
Year
2024
System applied
Bonded bituminous membrane + dimpled sheet

The challenge

A new build with a high water table and clay soil that holds water. The designer required a solution able to withstand occasional hydrostatic pressure.

The solution

We primed the concrete walls, fully bonded the bituminous membrane and protected it with a dimpled sheet and geotextile. The footing-to-wall junction was formed with a fillet and a reinforcing strip.

The result

The basement stayed dry through two springs with above-average rainfall.