Real projects

Flat roof waterproofing

Flat roof waterproofing
Location
Cluj-Napoca
Area
420 m²
Duration
9 days
Year
2025
System applied
PVC membrane 1.5 mm, mechanically fixed

The challenge

An office building with a large roof and numerous penetrations for ventilation plant. The existing polystyrene insulation ruled out open flame, and the building had to stay in use throughout.

The solution

We chose a single-ply mechanically fixed PVC system, hot-air welded — no flame and no odour. Every penetration received a welded prefabricated collar, and all seams were probe-tested along their full length.

The result

Work in the building was not interrupted for a single day. The roof passed the flood test at handover.